Project owner :SOGEA SATOM

Location :Sénégal

Study :2018-2019

Construction :2018-2020

Description

The project includes the laying of a third transmission line called ALG 3 after ALG 1 (for the Ngnith plant) and ALG 2 (for the Keur Momar Sarr plant). The first section of this transmission line will be laid between the plant and Thiès. The second will be laid between Thiès and Dakar. The total distance is 216 kilometres.

 

SC Afrique participated in this project, jointly financed by the AFD (French Development Agency), the EIB (European Investment Bank), the IsDB (Islamic Development Bank), the World Bank, the ADB (African Development Bank) and the Government of Senegal through SONES for a total amount of 87.2 billion CFA francs with the company SOGEA SATOM in charge of LOTS 3 and 4.

 

Our missions

  • Topography (site polygonal mesh, natural terrain surveys and layout)
  • Execution studies (combined views of the pipe, calculation notes, formwork and reinforcement plans of civil engineering works)